The all-electric (low floor) Cityline carries 22 passengers and boasts the latest EV technology, allowing for a smooth drive on zero emissions.

Featuring the latest NMC battery technologies with state of the art integrated Battery Management Software, your investment in the future is assured with EVM.

The Electric Cityline is powered by three Elinta battery packs, spread within the chassis which allows for equal and effective weight distribution. By delivering 93% efficiency at 70km/h, this minibus handles all topographies with ease and runs close to silent.

The e-Cityline is easy to handle and adapt to for both new and experienced EV users. Alongside smooth handling and a quiet ride, this electric low-floor minibus features synthetic-leather seats (with three-point seatbelts), wood-effect flooring, and brightly coloured handrails throughout, delivering a comfortable passenger experience no matter the journey.

Read about a customer's experience with the e-Cityline here!

 

 

 

Highlights:

  • Low floor access
  • Wheelchair ramp
  • 115 kW/h of battery storage
  • Digital Saloon Air Conditioning
  • Cruise Control
  • Blind Spot & Attention Assist
  • Panoramic Double-glazing
  • Faux leather passenger seats in two-tone fabric
  • Grab rails for passenger access and safety
  • Massat’s rapid sliding door
  • Roof emergency exit and ventilation hatch
  • EVM body moulded, colour-coded side skirts
  • Reversing camera
  • GSRII Pack
  • A 150kW motor delivering 1250Nm or torque at 1000rpm

The Cityline is also available in a Diesel model: click here to learn more!

IMAGES

SPECIFICATIONS

At A Glance

18 Seats + 4 Standing

1 Wheelchair Space

Elinta Electric 115 kWh

Elinta 115kW nmc

Direct Drive Automatic

Driver and Saloon AC

Panoramic Double Glazing

Floorplans

Side view 1

Cityline Minibus

Side view 2

Floor plan (top view)

Floor plan showing wheelchair area (top view)

Cityline minibus

Right side view (Wheelchair area)

Cityline Minibus

VEHICLES IN STOCK

New Vehicles

ENQUIRE

Please fill in your details below and a member of our team will be in touch with you as soon as possible.

Contact Details
Address Details
Industry Sector
Message
Marketing
Please select any ways that we can contact you regarding news, promotions and offers.

Privacy Notice
EVM will use the details you supply to enable us to contact you with information specific to your enquiry. We will share your details with our partners to facilitate the manufacture, registration and delivery of your new vehicle. We will also from time to time send you updates of our latest stock vehicles and new product releases. Full Privacy Policy can be viewed here.

Email Us

Please fill in your details below and a member of our team will be in touch with you as soon as possible.

Contact Details
Industry Sector
Message
Privacy Notice
EVM UK will use the details you supply to enable us to contact you with information specific to your enquiry. We may also from time to time send you updates of our latest stock vehicles and new product releases. Full Privacy Policy can be viewed here.