Tribus Sprinter – Sliding Entry Door

The Tribus Sprinter has accessibility and safety at its core, incorporating TriflexAIR 2.0 flooring within its modern design.

* Photos of Sliding Door Model on the way, please watch this product demonstration by Area Sales Manager, Katie Luckwell for a closer look.

The Tribus Sliding Entry Door minibus turns the Mercedes-Benz Sprinter into a versatile, wheelchair-accessible vehicle. It can transport up to 8 seated passengers, accommodate up to 4 wheelchairs, or offer a combination of both.

The electric, lowered entry step, combined with an automatic rear wheelchair lift, ensures flexibility and ease of use for various applications, offering a seamless experience for both passengers and drivers. Everything from the height of windows to ensure a clear view to the flooring system which is designed to repel debris within its moving parts, has been considered for the most efficient design.

This minibus can be driven on a standard car licence, making it accessible to a wider range of drivers and M1 Rated. An ideal solution for taxi, shuttle and airport services or within the care sector.

The Tribus comes in Electric and Diesel variants.

 

Highlights:

  • 7 TriflexAIR folding seats with integrated three-point seatbelts, designed for easy rotation and folding
  • Integrated wheelchair restraint system for maximum safety
  • 100% mechanical wheelchair safety system that automatically tightens during travel
  • Driver warning light ensures the wheelchair is securely fixed
  • M1-rated vehicle
  • Breathable upholstery
  • Fully automated PLS wheelchair lift
  • Lowered front entrance with a yellow safety entry bar
  • Passenger compartment heating and AC.

IMAGES

SPECIFICATIONS

At A Glance

8 Seater + Driver

Up to 4 Wheelchairs

Mercedes-Benz ON 65G

9G-Tronic Automatic

Single Glazing

Floorplans

Tribus with 8 Seats

Tribus with 6 Seats + 2 Wheelchairs

Tribus with 6 Seats + 2 Wheelchairs

Tribus with 3 Seats + 3 Wheelchairs

Tribus with 1 Seats + 4 Wheelchairs

VEHICLES IN STOCK

New Vehicles

ENQUIRE

Please fill in your details below and a member of our team will be in touch with you as soon as possible.

Contact Details
Address Details
Industry Sector
Message
Marketing
Please select any ways that we can contact you regarding news, promotions and offers.

Privacy Notice
EVM will use the details you supply to enable us to contact you with information specific to your enquiry. We will share your details with our partners to facilitate the manufacture, registration and delivery of your new vehicle. We will also from time to time send you updates of our latest stock vehicles and new product releases. Full Privacy Policy can be viewed here.

Email Us

Please fill in your details below and a member of our team will be in touch with you as soon as possible.

Contact Details
Industry Sector
Message
Privacy Notice
EVM UK will use the details you supply to enable us to contact you with information specific to your enquiry. We may also from time to time send you updates of our latest stock vehicles and new product releases. Full Privacy Policy can be viewed here.